# Floor Construction Breakdown
A breakdown of renders and material lists + costs for both the foundation and the sub floor
## Foundation
Just the foundation part that attaches the floor and house to the ground
### Foundation Material list
---
| Material | Amount | Cost per | part tot |
| ------------- | ------:| --------:| --------:|
| Cinder Block | 9 | 0 | 0 |
| 6x6x8' ground | 4 | 57 | 228 |
| 2x6x10' | 12 | 14 | 168 |
| **TOTAL** | | | 396 |
<!-- TBLFM: @I$>=(@I$2*@I$3) -->
<!-- TBLFM: @3$>=(@3$2*@3$3) -->
<!-- TBLFM: @4$>=(@4$2*@4$3) -->
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->
### Foundation Design Render
---
#### Angle shot
![[Screenshot 2023-04-09 at 12.29.39 PM.png]]
#### Top wire
![[Screenshot 2023-04-09 at 12.30.10 PM.png]]
#### Front Wire
![[Screenshot 2023-04-09 at 12.30.48 PM.png]]
#### Side wire
![[Screenshot 2023-04-09 at 12.31.25 PM.png]]
---
## Floor Joists
consists of the floor joists, and the 2x4s for the insultation install
### Floor Joist Material List
| Material | Amount | Cost per | part tot |
| --------- | ------:| --------:| --------:|
| 2x6x16' | 11 | 20 | 220 |
| 2x4x8' | 10 | 4 | 40 |
| 2x6x10' | 2 | 14 | 28 |
| **TOTAL** | | | 288 |
<!-- TBLFM: @I$>=(@I$2*@I$3) -->
<!-- TBLFM: @3$>=(@3$2*@3$3) -->
<!-- TBLFM: @4$>=(@4$2*@4$3) -->
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->
### Floor Joist design render
#### angle shot
![[Screenshot 2023-04-09 at 12.29.13 PM.png]]
#### top render
![[Screenshot 2023-04-09 at 12.03.47 PM.png]]
#### front render
![[Screenshot 2023-04-09 at 12.04.11 PM.png]]
#### side render
![[Screenshot 2023-04-09 at 12.04.50 PM.png]]
---
## SubFloor
consists of the top and bottom osb and the insulation
### Sub floor Material List
| Material | Amount | Cost per | part tot |
| ------------------ | ------:| --------:| --------:|
| 19x32 osb | 10 | 27 | 270 |
| R21 400sqft bubble | 1 | 150 | 150 |
| 3m foil tape | 1 | 11 | 11 |
| **TOTAL** | | | 431 |
<!-- TBLFM: @I$>=(@I$2*@I$3) -->
<!-- TBLFM: @3$>=(@3$2*@3$3) -->
<!-- TBLFM: @4$>=(@4$2*@4$3) -->
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->
### Sub floor design render
#### angle shot
![[Screenshot 2023-04-09 at 12.23.38 PM.png]]
---
---
## Total Price
| Part | price |
| ---------- | -----:|
| foundation | 396 |
| joists | 288 |
| sub floor | 431 |
| **TOTAL** | 1115 |
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->