# Floor Construction Breakdown
|
||
|
A breakdown of renders and material lists + costs for both the foundation and the sub floor
|
||
|
|
||
|
## Foundation
|
||
|
Just the foundation part that attaches the floor and house to the ground
|
||
|
### Foundation Material list
|
||
|
---
|
||
|
| Material | Amount | Cost per | part tot |
|
||
|
| ------------- | ------:| --------:| --------:|
|
||
|
| Cinder Block | 9 | 0 | 0 |
|
||
|
| 6x6x8' ground | 4 | 57 | 228 |
|
||
|
| 2x6x10' | 12 | 14 | 168 |
|
||
|
| **TOTAL** | | | 396 |
|
||
|
<!-- TBLFM: @I$>=(@I$2*@I$3) -->
|
||
|
<!-- TBLFM: @3$>=(@3$2*@3$3) -->
|
||
|
<!-- TBLFM: @4$>=(@4$2*@4$3) -->
|
||
|
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->
|
||
|
|
||
|
### Foundation Design Render
|
||
|
---
|
||
|
#### Angle shot
|
||
|
![[Screenshot 2023-04-09 at 12.29.39 PM.png]]
|
||
|
|
||
|
#### Top wire
|
||
|
![[Screenshot 2023-04-09 at 12.30.10 PM.png]]
|
||
|
|
||
|
#### Front Wire
|
||
|
![[Screenshot 2023-04-09 at 12.30.48 PM.png]]
|
||
|
|
||
|
#### Side wire
|
||
|
![[Screenshot 2023-04-09 at 12.31.25 PM.png]]
|
||
|
---
|
||
|
|
||
|
## Floor Joists
|
||
|
consists of the floor joists, and the 2x4s for the insultation install
|
||
|
|
||
|
### Floor Joist Material List
|
||
|
| Material | Amount | Cost per | part tot |
|
||
|
| --------- | ------:| --------:| --------:|
|
||
|
| 2x6x16' | 11 | 20 | 220 |
|
||
|
| 2x4x8' | 10 | 4 | 40 |
|
||
|
| 2x6x10' | 2 | 14 | 28 |
|
||
|
| **TOTAL** | | | 288 |
|
||
|
<!-- TBLFM: @I$>=(@I$2*@I$3) -->
|
||
|
<!-- TBLFM: @3$>=(@3$2*@3$3) -->
|
||
|
<!-- TBLFM: @4$>=(@4$2*@4$3) -->
|
||
|
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->
|
||
|
### Floor Joist design render
|
||
|
#### angle shot
|
||
|
![[Screenshot 2023-04-09 at 12.29.13 PM.png]]
|
||
|
|
||
|
#### top render
|
||
|
![[Screenshot 2023-04-09 at 12.03.47 PM.png]]
|
||
|
#### front render
|
||
|
![[Screenshot 2023-04-09 at 12.04.11 PM.png]]
|
||
|
#### side render
|
||
|
![[Screenshot 2023-04-09 at 12.04.50 PM.png]]
|
||
|
---
|
||
|
|
||
|
## SubFloor
|
||
|
consists of the top and bottom osb and the insulation
|
||
|
|
||
|
### Sub floor Material List
|
||
|
| Material | Amount | Cost per | part tot |
|
||
|
| ------------------ | ------:| --------:| --------:|
|
||
|
| 19x32 osb | 10 | 27 | 270 |
|
||
|
| R21 400sqft bubble | 1 | 150 | 150 |
|
||
|
| 3m foil tape | 1 | 11 | 11 |
|
||
|
| **TOTAL** | | | 431 |
|
||
|
<!-- TBLFM: @I$>=(@I$2*@I$3) -->
|
||
|
<!-- TBLFM: @3$>=(@3$2*@3$3) -->
|
||
|
<!-- TBLFM: @4$>=(@4$2*@4$3) -->
|
||
|
<!-- TBLFM: @>$>=sum(@I$>..@-1) -->
|
||
|
### Sub floor design render
|
||
|
#### angle shot
|
||
|
![[Screenshot 2023-04-09 at 12.23.38 PM.png]]
|
||
|
|
||
|
---
|
||
|
---
|
||
|
|
||
|
## Total Price
|
||
|
| Part | price |
|
||
|
| ---------- | -----:|
|
||
|
| foundation | 396 |
|
||
|
| joists | 288 |
|
||
|
| sub floor | 431 |
|
||
|
| **TOTAL** | 1115 |
|
||
|